Small Batch PCB

Small Quantities.
Full Quality.

From 1 piece to 500 pieces. No forced minimums, no quality compromises, no attitude. Complex boards in small quantities are our specialty.

[ Photo: small batch of various PCBs packaged ]

The Small Batch Problem — Solved

Most manufacturers want 50-piece minimums. For complex boards, they want even more. We're built differently.

True 1-Piece MOQ

Order one board or five hundred. No minimum quantity, no setup surcharges for single pieces.

Complex Boards Welcome

Rogers, HDI, rigid-flex in quantities of 3-5 pieces? No problem. Other shops refuse — we specialize in this.

Same Process, Any Qty

Your 5-piece order goes through the same IPC-certified process as a 500-piece run. No shortcuts.

Volume Pricing at 10+

Unit cost drops significantly at 10, 50, and 100 pieces. Get instant pricing at any quantity.

Easy Reorders

Design files stored. Reorder in one click when you need another batch. Same specs guaranteed.

Material Certificates

Even on 3-piece Rogers orders, you get laminate CoC. Full traceability at any volume.

Who Orders Small Batches

Real use cases from our customers.

[ Photo: engineer testing prototype ]

Prototype Iteration

1-5 pcs per revision. Fast design cycles.

[ Photo: small stack of boards ]

Pre-Production Validation

10-50 pcs for DVT/PVT builds.

[ Photo: packaged batch ]

Low-Volume Production

50-500 pcs for niche products.

[ Photo: single board replacement ]

Spare & Replacement

5-20 pcs for legacy system support.

Transparent Small-Batch Pricing

Unit cost decreases with volume. No hidden setup fees.

Example: 4-layer FR-4, 100x80mm, 1.6mm, ENIG, impedance controlled

5 pcs
Prototype
10 pcs
-15% per unit
50 pcs
-40% per unit
100 pcs
-55% per unit

Exact pricing depends on your specifications. Get instant quote with your Gerber files.

FAQs

Small Batch Questions

Is there really no minimum order?

Correct. 1 piece is fine. We process single-board orders every day. No attitude, no hidden surcharges.

Why do other manufacturers require minimums?

Panel utilization. They need enough boards to fill a production panel efficiently. We optimize panel layout for small orders and absorb the efficiency cost — it is built into our pricing model.

At what quantity should I switch to production pricing?

Unit costs drop significantly at 50+ pieces. At 500+, consider our production tier with dedicated tooling for even better pricing. The quote system shows you exact pricing at any quantity.

Can I order exotic materials in small quantities?

Yes. Rogers, PTFE, polyimide — available from 1 piece. We verify material stock before confirming orders to avoid delays.

Need a small batch?

1 piece or 500. Upload your files, pick your quantity, get instant pricing.