Quick-Turn PCB
Fast PCBs.
No Shortcuts.
24-hour rush for 2-layer boards. 3-5 days for complex multilayer. Same IPC-certified quality, just faster. DHL Express to your bench.
Most rush orders confirmed within 2 hours during business hours.
[ Photo: express PCB production / DHL shipment ]
How We Deliver Fast Without Cutting Corners
Speed through preparation, not shortcuts.
Priority Queue
Rush orders jump to front of production line. Dedicated engineer assigned immediately.
24/7 Factory
Production runs around the clock. Three shifts, no overnight pauses on rush orders.
Same QC Standards
Electrical testing, AOI inspection, impedance verification — no quality steps skipped.
Instant DFM
Engineering review prioritized for rush orders. Issues flagged within 4 hours.
DHL Express
Boards ship same day as completion. 2-4 day delivery worldwide.
Guaranteed Spec
If rush boards fail to meet spec, we expedite a replacement at no cost.
Quick-Turn Lead Times
Production days from DFM approval. Shipping additional 2-4 days via DHL.
| Board Type | Rush | Express | Standard |
|---|---|---|---|
| 2-Layer | 24 hours | 3 days | 5 days |
| 4-Layer | 48 hours | 3 days | 7 days |
| 6-Layer | 3 days | 5 days | 8 days |
| 8-Layer | 4 days | 6 days | 10 days |
| 10-16 Layer | 5 days | 7 days | 12-15 days |
| HDI (1-step) | — | 8 days | 10 days |
| Rogers/PTFE | 5 days | 7 days | 10 days |
[ Photo: boards being packaged for express shipping ]
When You Need It Yesterday
We understand that prototype deadlines drive product launch timelines. A 2-day delay in PCBs can mean a 2-week delay in getting to market.
That's why our rush service isn't just about moving faster through production — it's about removing every bottleneck: priority engineering review, dedicated production slot, same-day shipment.
And unlike shops that sacrifice quality for speed, every rush board passes the same electrical test, AOI inspection, and impedance verification as our standard orders.
FAQs
Quick-Turn Questions
Is rush pricing much more expensive?
Rush adds 30-80% to standard pricing depending on board complexity and timeline. The premium reflects dedicated production resources, not a simple markup.
Can you rush complex boards (HDI, Rogers)?
Express turnaround is available for most board types. HDI can be delivered in 8 days (vs 10-14 standard). Rogers/PTFE in 7 days. True 24-hour rush is limited to 1-4 layer FR-4.
What if my design has DFM issues?
Rush DFM review is prioritized — we flag issues within 4 hours. If changes are needed, the clock restarts from approval, not from original order.
Do you guarantee the rush date?
Yes. If we accept a rush commitment and fail to deliver on time due to our error, the rush premium is refunded.
Need boards fast?
Upload files now for instant rush pricing. Most orders confirmed within 2 hours.